Please go thru below JD carefully and relevant candidates only share cv thru below email only -
gulam.r@ja-hr.com
ELECTRICAL AIS & GIS
SUBSTATION PROJECT
SYSTEMS AND MATERIALS
1) ELECTRICAL MATERIALS
a. GIS Equipment’s (380kV, 132kV etc.,)
b. GIBD (Gas Insulated Busducts)
c. GIS LCC (Local Control Cubicle)
d. Power Transformers
e. Shunt / Bus Reactor
f. Capacitor Bank
g. 33kV & 13.8kV MV Switchgears
h. Solid Insulated
i. Auxiliary Transformer / Station Service
Transformers (SST)
j. Grounding Transformer
k. Neutral Grounding Resistor
l. RMU (Ring Main Unit)
m. AIS Equipments like CB, Isolators, CT,
VT/PT, CVT, Wave trap, Surge Arrestor,
Earth Switch etc
n. Steel Lattice Structures for Substation
Equipments
o. Steel Structural Gantries
p. AC/DC Distribution Panels
q. AC/DC Lighting Panels
r. HV Power Cables
s. MV Power Cables
t. LV Power Cables
u. LV Control Cables
v. Instrumentation & Communication
Cables
w. Lighting Cu. Wires (1.5/2.5/4/6 Sq.mm)
x. G.I/Aluminium Cable Trays (Ladder &
Perforated Type)
y. Cable Raceways
z. Lighting & Power Receptacles
aa. Industrial Plugs & Sockets
bb. Switch & Sockets
cc. Lighting Fixtures
dd. Lighting Masts / Poles
ee. Shielding Mast
????. Cable Glands & Lugs
gg. End Termination Kits
hh. Straight Through Joint Kits
ii. Cable Sealing Ends for MV Cables
jj. Battery & Battery charger
kk. Earthing & Grounding materials like
G.I/Cu. Earth Flat/Rod, Bare Cu.
Conductor, Grounding Conductor
List of other Electrical Systems and its Panels
i. SAS System
ii. SCADA System
iii. Control & Protection System
iv. AMI / Revenue Metering & Annunciation
System
v. Cyber Security System
vi. Telecommunication System
vii. ELV System (CCTV, ACS, PAS/PAGA, LCS,
LAN/WLAN)
viii. Online PDMS System for GIS
ix. Hot Spot Temperature Monitoring System
for Power Transformer
x. Solid Insulated Busbar (SIB) System for
MV Switchgear
Page 2 of 2
2) MECHANICAL MATERIALS
a. HVAC – PACU
b. HVAC – Ducts
c. HVAC – Fans
d. HVAC – DDC Control Panels
e. Fire Detection / Fire Alarm System
f. Electrical Pumps for FPS System
g. Fire Suppression System (FM200)
h. Electric Overhead Travelling Crane
(EOT Crane)
3) CIVIL & STRUCTURAL MATERIALS
Familiar with Electrical Substation
Building of following types
a. Cast-in-place Concrete building
b. Precast Concrete Building
c. Steel PEB frame with CMU wall
cladding
???? Immediate Hiring – Join Our Team in Jubail! ????We are hiring experienced professionals to po
Mubarak Faleh Alyami General Contracting Company is currently hiring experienced professionals for u
???? **URGENT REQUIREMENT – ARAMCO PROJECT (KSA)** ???????? Company: Hyundai Engineering Company L
We are looking for Aramco Certified Project Manager For MEP Projects- Should have Pervious Approval
A contracting company in the Eastern Province of Saudi Arabia is looking for a skilled Structural En
Job Vacancy – Procurement EngineerSAFELCO Co. Ltd. is currently looking to hire a Procurement Engi
HVAC ENGINEER LOCATION : RAS AL KHER DURATION : 45 DAYS WHATSAPP : 0590062083
Urgent requirements for Electrical Engineers with a minimum of 10 years of experience are needed for
We are looking for an Estimation Engineer with 3–5 years of experience in cost estimation, BOQ pre
We are a structural steel manufacturing company based in Riyadh and are looking to hire a QC Enginee